Skip to main content
FREE Delivery!|(971) 459-3124

Washington County, Oregon ยท Free Delivery

Fill and Base Material Delivered in Manning, OR

Free delivery to Manning on every order, with loads arriving in as fast as 2 business days.

Delivering to Manning, OR

Free delivery on every order.

  • Free delivery to Manning
  • Order from 1 ton
  • As fast as 2 business days

Gravel delivered to Manning

Crushed gravel and base materials that compact under tires.

3/4 Minus

3/4" minus blend compacted under roads and heavy-load areas

From 1 Ton Delivered, FREE to your Doorstep

Cost per ton lowers the more you order!

Free delivery to Manning

Rock & Stone delivered to Manning

Graded crushed stone for drainage, concrete and heavy work.

RipRap

4" to 12"+ rock for shorelines, slopes and culvert outlets

From 1 Ton Delivered, FREE to your Doorstep

Cost per ton lowers the more you order!

Free delivery to Manning

Decorative delivered to Manning

Rounded stone for beds, borders and water features.

Sand delivered to Manning

Washed sand for masonry, concrete and leveling.

Soil, Fill & Mulch delivered to Manning

Soil and fill by the ton, mulch by the cubic yard.

How delivery to Manning works

  1. 1

    Pick the material and quantity.Open a product to see your price, with free delivery to Manning.

  2. 2

    Choose a delivery date at checkout.As fast as 2 business days for most Manning addresses.

  3. 3

    Clear a drop spot.The truck tips the load where you mark it. Note low wires or branches when you order.

Not sure how much you need?

Enter length, width and depth and the calculator returns the cubic yards and tons for your project.

Open the calculator

If you are pricing gravel and aggregate delivery in Manning, OR, start by sizing the load. Oregon Rock Supply sells bulk material by the ton or by the yard, and every product page carries a calculator for that.

Most ground work around here starts with 3/4 minus, the crushed rock graded 3/4 inch down to fines that compacts and locks up under a drive, a pad or a shop floor.

Delivery to Manning and the Surrounding Area

You order online, choose your quantity, and pick a delivery date at checkout. A dump truck then tips the load on your site.

We deliver across Washington County, including Hillsboro, Beaverton, Forest Grove, Tualatin and Sherwood. Manning sits in Washington County, so a job here is a standard bulk delivery.

Work out your tonnage before you order, because a short load stalls a pour and a long one leaves a pile sitting on the grade.

Materials for Manning Projects

This is fill and sub-base country. A lot of work around Manning starts with raising grade or building a pad, and that means choosing between raw and processed material before anything gets surfaced.

Fill Dirt is bulk fill for raising grade, backfilling and building up low ground. It goes down first, before a graded base course goes on top.

Quarry Run is raw rock straight from the pit or quarry face, uncrushed and rough. It builds up soft ground and raises grade on a pad site.

3/4 Minus, also called 3/4-0, is the standard Oregon base under driveways, parking pads, shop floors and shed bases. The fines let it compact and lock up.

Driveway Gravel surfaces an existing drive or tops a compacted base. On most Oregon drives that means a minus rock that compacts rather than a clean rock that rolls underfoot.

For drainage rather than fill, Drain Rock is washed and open, so water moves through it instead of sitting in the trench. It suits French drains, footing drains, drywells and downspout runs.

Ground and Conditions in Manning

Across the Willamette Valley and Portland Basin, the valley floor is deep slackwater silt left by the ice-age Missoula floods. In the foothills you get red clay and silty clay loam of the Jory series, and river gravel along the waterways.

That silt and clay sheds water slowly. This part of the state takes 35 to 45 inches of rain a year, almost all of it between November and March, and the lowlands carry a seasonal high water table.

The practical result is a soft subgrade. A pad or drive built on fill that was never brought up properly will move under a truck, no matter what surface goes on top.

Winter is also the hard season for bare ground. Portland treats October 1 to April 30 as the wet weather season, with bare ground to be stabilized within two days, against seven days from May 1 to September 30.

Frost is a minor concern here next to saturation. Washington County sets the frost depth at 12 inches, the Oregon figure below about 2,500 feet, and that is a footing depth rather than a gravel base depth.

Order 3/4 Minus for Your Manning Job

For most ground work around Manning, 3/4 minus is the base that carries the load, with fill dirt or quarry run underneath it when grade has to come up. Size the quantity, choose your date, and place the order online.

Frequently Asked Questions

Common questions about gravel and aggregate delivery in Manning, OR

What is the best base under pavers in Manning?

Use 3/4 minus as the structural base, then bed the pavers on 1/4 minus, also called quarter minus, the crushed fines product that gives you a fine, level bedding course. Both compact well, which matters on the silt and clay ground across this part of the state. Order the two materials as separate loads so you can shape the base before the bedding goes down.

Do you supply contractors working in Manning?

Yes. Oregon Rock Supply delivers bulk aggregate, sand, soil and mulch to job sites across Washington County, and contractors order online by the ton or by the yard. You pick the quantity and the delivery date at checkout, and a dump truck tips the load on site. Material is available for drives, pads, drainage, retaining wall backfill and landscape work.

What access does the truck need at my Manning address?

A clear, level spot the truck can reach and tip in, with nothing parked in the way and no low branches or wires over the approach. If the drop is behind a gate, tell us the width when you order. Soft ground after rain is the usual reason a delivery in Manning has to be moved, so point out anywhere the truck should not drive.